About Me
Experience
IT Projects expert with more than eight years experience in the field of Project Management, Business Analysis, ERP Implementation and Accounting
Blog Archive
Labels
- Approach (16)
- Useful (16)
- BPM (14)
- Process Analysis (14)
- Business Processes (12)
- BA (11)
- Video (11)
- Six Sigma (9)
- Documents (5)
- PM (5)
- Quality control (5)
- Communication (4)
- C/E Matrix (3)
- Certificate (3)
- Lean (3)
- News (3)
- Requirements (3)
- Software (3)
- Conference (2)
- FMEA (2)
- HR (2)
- Internet (2)
- TOGAF (2)
- Book (1)
- Dictionary (1)
- EAI (1)
- ITIL (1)
- SOA (1)
Posted by
Camper Trip 2023
Wednesday, 15 July 2009
comments (0)
Posted by
Camper Trip 2023
FMEA (Failure mode and effects analysis) is a part of DMAIC in Six Sigma
Is a step after C&E Matrix ant it is used for analysis of potential failure modes within a system
Every defect is measured by Severity, Occurrence and Detection. The multiplication of these elements gives the Risk prioritization (Risk Priority Number RPN) for every case.
Uses of FMEA
- Development of system requirements that minimize the likelihood of failures.
- Development of methods to design and test systems to ensure that the failures have been eliminated.
- Evaluation of the requirements of the customer to ensure that those do not give rise to potential failures.
- Identification of certain design characteristics that contribute to failures, and minimize or eliminate those effects.
- Tracking and managing potential risks in the design. This helps avoid the same failures in future projects.
- Ensuring that any failure that could occur will not injure the customer or seriously impact a system.
- To produce world class quality products
Advantages
- Improve the quality, reliability and safety of a product/process
- Improve company image and competitiveness
- Increase user satisfaction
- Reduce system development timing and cost
- Collect information to reduce future failures, capture engineering knowledge
- Reduce the potential for warranty concerns
- Early identification and elimination of potential failure modes
- Emphasis problem prevention
- Minimize late changes and associated cost
- Catalyst for teamwork and idea exchange between functions
- Reduce the possibility of same kind of failure in future

Subscribe to:
Posts (Atom)